Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


from 33kv to 440v 2mva transformer how much full load
current will be at ht side and lt side and which range of
ctpt will be used?



from 33kv to 440v 2mva transformer how much full load current will be at ht side and lt side and w..

Answer / bala.a

35 A on HT Side 2625 A on LT Side nd requiired CT on HT
side will be 50A and LT side 3200A (because the standard
breaker rating is 3200 A )

Is This Answer Correct ?    7 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

Rccb trip or not with out neutral connect in three phase welding machine

1 Answers  


in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?

0 Answers   DNJ Energy LLC, WI,


What is the basic working principle of Tri vector meter?

5 Answers   TCS,


Please explain me abt PQ diagaram in the power sector.

0 Answers  


How to calculate or formula to calculate rhe power in 2 phase system ??

0 Answers  


describe the fully control circuit diagram of ac drives

0 Answers  


what is meaning of Power factor?????????

3 Answers  


How do I calculate/select Droop CT ratio for various capacity of generators?

0 Answers  


can we use the same fuse for both ac and dc?

3 Answers  


How To increase Knowledge Of boliler regarding To Only Electrical Field..

0 Answers  


how dg's working of 1000kva.

1 Answers  


Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)