WHAT IS MODULATION AND NEED FOR MODULATION ?
Answer / jyoti sheoran
MODULATION IS A SCHEME WHICH ALTERS SOME CHARACTERISTICS OF
THE HIGH FREQUENCY CARRIER IN ACCORDANCE WITH THE LOW
FREQUENCY MESSAGE SIGNAL CALLED THE MODULATING SIGNAL.
THERE ARE THREE TYPES OF MODULATION :-
1). AMPLITUDE MODULATION(AM) :-
IN THIS TYPE OF MODULATION
FREQUENCY AND PHASE REMAINS SAME, ONLY THE AMPLITUDE
CHANGES.
2). FREQUENCY MODULATION(FM) :-
IN FM THE PEAK AMPLITUDE
AND PHASE REMAINS CONSTANT BUT AS THE AMPLITUDE OF THE
INFORMATION CHANGES, THE FREQUENCY OF THE CARRIER CHANGES
CORRSEPONDINGLY.
3). PHASE MODULATION(PM) :-
PM IS USED IN THE SAME SYSTEM
AS AN ALTERNATIVE TO FREQUENCY MODULATION. IN PHASE
MODULATION, THE PHASE OF THE CARRIER SIGNAL IS MODULATED TO
FOLLOW THE CHANGING VOLTAGE LEVEL OF THE MODULATING SIGNAL.
NEED FOR MODULATION :-
1: EFFICIENT RADIATION
2: FREQUENCY TRANSLATION
3: MULTIPLEXING
4: REDUCTION OF NOISE
| Is This Answer Correct ? | 7 Yes | 0 No |
the problem faced on star or delta winding connection??
what is the name of the oil is used in transformer?
what is legal process of dg set?
what will happen if neutal in AC ckt will get open
For polarity test on a 11/3.3kV 2.5MVA delta-star Unit Auxiliary transformer,415V 3-phase supply was applied at the HV. Connection between Aa was made with a 2.5mm cable. As soon as power was switched on the cable caught fire and burnt. This test was then abandoned. It is noteworthy to say that a similar cable was also used in a similar transformer for the same. The cable did not burn and test was successfully completed with good result. What is wrong? Please, help me out.
What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.
How much RPM in Turbocharger in Diesel engine.
which will glow brighter?bulb 1 (110v,100w) and bulb 2 (230v.200w) series connection
DG lube oil and waste oil how to dispose outside and there is any authorised vendors will be there for this.
while calculating the power absorbed by a resistor connected to the output of a half wave rectifier circuit should we use rms or average current? explain with reason.
What principle and operation of frency drive
What is the Difference Between the SCADA & PLC ? Both it also control and Supervise Then what Special in Scada & PLC?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)