Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How many 2 ton window A/c can runs on a 125 KVA generator?

Answers were Sorted based on User's Feedback



How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / hareesh k.s.

1 ton=1500W(App.)

2ton=3000W=3.75KVA

utility power of generator is 90%=125x90/100=112.5KVA

Therefore,no.of a/c's=112.5/3.75=33

Is This Answer Correct ?    39 Yes 20 No

How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / bala.a

Mr.das
yourmconversion is wrong bec 1 ton = 3.51 KW is too high ,
generally all the people recommended 1 ton A/C = 1 TO 1.5
kw so please take this type of conversion .

Is This Answer Correct ?    7 Yes 5 No

How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / sushovan das

1 Ton = 12000 Btu/hr.
also one Btu/h is equal to 0.293 watts so...One ton = 3.516
Kilowatts
Hence, 2 Ton = 2*3.516 KW = 7.032 KW

Let we take efficiency of Power Generator = 98%.
Hence, 125 KVA = 125*98% = 122.5 KW.
so no of AC can run on a 125 KVA Generator = 122.5/7.032 =
17 (nearest no) (Ans)

Is This Answer Correct ?    12 Yes 12 No

How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / engr stev

Here is the answer with Simple Explanation...
Visit the link
http://www.electricaltechnology.org/2014/02/why-AC-rated-in-Tons-Not-in-kW-or-kVA.html

Is This Answer Correct ?    1 Yes 2 No

How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / alex

You guys are close.

1ton does indeed = 1400 watts (starting power is higher than the continuous 1150 watts). But the power factor won't be 98%, it'll be more like 80%. So the 120kva = 100,000 watts.

2800 watts each works out to 35 or so 2ton window ACs.

Is This Answer Correct ?    4 Yes 8 No

How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / abhishek

1ton = 1400watts
so, approximately 38A/c can run on 125KVA generator.

Is This Answer Correct ?    3 Yes 8 No

How many 2 ton window A/c can runs on a 125 KVA generator?..

Answer / girish

50 A/cs of 2 Ton can run smoothly on a 125 KVA generator

Is This Answer Correct ?    9 Yes 22 No

Post New Answer

More Electrical Engineering Interview Questions

in short circuit. test of a transformer 5 to 10% ofvrated voltage is used why??? if we use rated voltafe then what will be?

1 Answers  


what are the 4 rules to start the motor?

0 Answers   JK Associates,


Can we use 11kv Trivector Metre or Energy metre instead 33kv Metre at 33kv Over Head Line metering purpose?

5 Answers   Bhel,


i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice

0 Answers  


what is ten delta test? what is the significanse of it

1 Answers  


what is the working principle of electrical generator

1 Answers  


what is the difference between megger and earth tester?

28 Answers   Ashok Leyland, IOCL, RRL,


I try to check the three phase voltage in multimeter, in 125A isolator switch incommer. first i touch R phase, and then i touch Y phase using multimeter, the moment i touched, it blasts and that moment i got blindness. multimeter selector position is correct(750V AC MODE AND RED PROBE WASS IN v AND BLACK PROBE WASS IN COM. MODE. COULD ANYBODY GIVE ANSWER FOR THIS TO AVOID FURTHER ACCIDENTS PLEASE?

2 Answers  


How we calculate DC inducation moter Amp? Sir pls give me formula......

0 Answers   Superlite,


Do these factors (settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot)) are the part of first order, second order, higher order, linear, non-linear, open-loop, closed-loop, homogeneous & non-homogeneous systems ?

1 Answers   Limton,


Safety devices in SF6 Circuit Breaker?

1 Answers   DELL,


HOW TO CALCULATE THE VT SIZING?

0 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)