Can i connect all earth pits in ring system...,
And wat IS 3043 says...please help me
Answer / manikandan
According to IS 3043 earthing pits can be connected together
but the Lightning arr ester , Transformer neutral should
not be connected together since there will be restriking
faults frequently.
| Is This Answer Correct ? | 1 Yes | 1 No |
What is basic fundamental for choosing NGR or NGT for any generator neutral grounding
how to select energy meter? have any calculation?
if its possible for step up or step down DC volage directly ? possible means how we can do it ?
How to Calculate Stc Rating of an indoor type VCB Panel? What is a full form of STC?
I am an electrical engineer, I found variation in KWH between DG and EB for Same load for same duration, can any one help me why this variation arises?
what is inverter
What is disadvanage if power factor goes to in leading..?
What is hysteresis loss?
The normal highest generated voltage in India is a) 6.6KV b) 132KV c) 11KV
sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.
about transformer oil material & Test name for the measurement of its dielectric strength & wht will u do if its dielectric strength goes low ?
Waht is Inductor?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)