What should be the values of settling time, peak time,
steady state error, overshoot, rise time, MPOS (Maximum
percent over shoot) to keep the system in transient state,
to keep the system in steady state ?
No Answer is Posted For this Question
Be the First to Post Answer
is there any lightning by passer is arranged in ship like buildings?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
How size of Earth Strip is determined for a particular Fault current.
why we are testing cables with DC supply not with AC supply?
9 Answers Aurobindo, DEWA, L&T,
why most of the substations are rated in multiples of 11?
Explain RYB?
what is the name of oil used in transformer
11 Answers Energy Pack, Genco,
How phase to phase voltage comes 440V.
choose the non-switch device (A) transformer (B) diode (C) transistor (D) IC
what is AB switch???
can we use metering current transformer as protection current transformer if not why? & if yes why?
what is the purpose of %impedance for transformer