Answer / vikram babu t.r
The Basic difference between the PLC and the DCS is PLC is
Programmable Logic Controller in an n/w it control program
logically.DCS is Distributed Control System it will
distripute and control the system in a n/w or more. So Group
of PLC is know as DCS.
| Is This Answer Correct ? | 22 Yes | 3 No |
Answer / saravana kumar
The major difference between PLC and DCS is networking...and
most often PLC is used for ESD applications..for shutdown
sequence .....PLC cannot have a HART compitable I/O ...where
HART signls are used for Asset management..DCS you can have
all features such as asset man..
| Is This Answer Correct ? | 5 Yes | 12 No |
Identify the electrical variable that is either directly or inferentially used by various instruments to determine the value of a measured variable.
if conical type tank in top LEFT side solid material coming but LT MOUNTED IN TOP OF LEFT SIDE, how to measure ultrasonic level transmitter ?
What is capacity of impulse line tube ...answer in psi
principle of automatic votage regulator
in a electronic controller why we are using 250 ohm resistance in input signal?is i/p is necessary in control valve when we are using electronic controller give details?
Consider a level troll. i am getting a correct value in 4mA and 20mA. the value in the middle(30 to 60%)is disturbed and i am not getting the appropriate value. what is the solution to normalize the level and to get the correct value..
hi am durga, i just now completed my eie [2009] , can anyone please guide me what r courses i need to join to enter into core company
what is the difference between Ethernet unmanaged and managed Switch?
why can't we use 5-20mA standard or some other instead of 4- 20mA?
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826
What is the advantage of using locally fabricated hook ups over Pre fabricated hook ups in process instrumentation?
0 Answers Engineers India Limited,
Draw a 3 element level control loop and explain
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)