Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Advantages of low voltage drive (control panel)



Advantages of low voltage drive (control panel)..

Answer / guest

1. it is user friendly
2. reduce cast
3. energy saving
4. no external PLC
5. application dedicated feature.
6. smooth power loss ride through
7. adaptive protection
8. easy to use

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

if transformer winding burn on dc supply then why not alternator rotor winding please post answer on y.sakhare@rediffmail.com

4 Answers   MahaGenco,


What is load curve?

2 Answers  


What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?

0 Answers  


are you hear the meaning of burden , excat meaning of burden in only one word

4 Answers  


Why Power generation in India is at 50Hz while in America its 60Hz so is there any advantage/Disadvantage of this ??

38 Answers   Australia Visa, College School Exams Tests, Fiat, InfoPlus, L&T, NTPC, TCS,


why current increases when voltage decreases in ac system

10 Answers  


give me atleast four differences between circuit and network

0 Answers  


The cable area of cross section is 185 sq mm. How to convert this to the diameter.

7 Answers   Syscon,


If you don’t have coal, salt and copper, then how would you earth your connection temporarily at a campus site?

2 Answers  


Why the motor take high starting current for long time(10- 15 sec) which is connected to Blower as compaire with a motor which is connected with pump with same rating?

2 Answers  


. Why the transmission lines are in 11kV, 22kV, 33kv, and why not 10kV, 20kV, 30kV?

3 Answers  


how many earthing required for ups, what should be the earth voltages

9 Answers   Juniper Networks,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)