i am going to give the JSEB,RANCHI exam for power plant,so i
need some samples of papers related to that,so please send
me these papers by my mail id.
No Answer is Posted For this Question
Be the First to Post Answer
whether starting current is limited to rated current of motor through soft starting or it exceeds the rated current?
what can i do, if i want to carrier in design as i am electrical engg?
i have a 1500kVA transformer what is the kWH meter i need to use?
0 Answers HP, L&T, Mohammed Harasani Architects,
what is the advantage and disadvantage of billing in kwh and kvah by electricity board .
ROC converges if poles and zeros lie inside a. Origion b. Z=1
how to calculate the lightning arrester conductor @ no of earth pits required
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.
what is cathodic protaction?
my question is Megger of cable insulation or swgr board meggerring some values in one day 50mohms,some other day checking different values(20Mohms). this tell that some person tell that that values ok. how to identify the megger value is correct. pls tell me the answer.
Explain what is rated speed?
definition of transponder?
its Kva and Kv are same?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)