In waterfall model, while your are coding if you happen to
know that one of the requirement was wrong and there will
be no use in implementing it and moreover it is going to
cause problems to the final output. Then do you have the
flexibility to go back and change the requirement?
Is this flexibility there in Vmodel?
Answers were Sorted based on User's Feedback
Answer / amrita
No in waterfall model its not posible to go back to previous
stage.............if we found any bug or error..............
yes in V Model its possible..................
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / tushar nagarkar
No the basis of waterfall model is to go through all the
steps of SDLC but does not allow to go a phase back....
However real time scenarios may differ but for the
question's sake lets take the answer as NO
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / qaprofessional
I think its not possible, as both these are sequential
models! As stated you have started coding, so the design are
completed and the test cases have all been prepared.
| Is This Answer Correct ? | 0 Yes | 1 No |
What is the difference between Functional test cases and UAT test cases?
what r the fields present in requirement tracability metrice (RTM)?please explain each and every field as i m not aware.
In which stage regression testing is done in testing process.
what is CMM Explain the difference between adhoc and smoke testing explain Bug life cycle Explian STLC What is severity and priority and example of highseverity and low priority
What is Stability and Performance Testing in Testing the TV
if u find a bug and reported to devoloper, but he is not agree with ur openion what u will do,how u convince to them
How to test Snapchat
how can client know that the bug which has been corrected
Who will prepare the Tracaility Matrix?
what is call-pair ,cross testing,
what is peer test?
2 Answers Semantic Space, SoftProdigy,
Can anyone explein me the differences between Product Testing and Project Testing??????