Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


beam top main reinforcement(25mm) was drilled off by
mistakely when making drill hole for dummy columns. any one
can give useful information for this issue or related code
or websites.

Answers were Sorted based on User's Feedback



beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy co..

Answer / suresh baria

Remove the top covering of beam, Observe the laying of top
reinforcement then drill the hole of required dia berween
the top reinforcementof beam for the errection of
reinforcement of dummy columns.

Is This Answer Correct ?    1 Yes 0 No

beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy co..

Answer / ashok kumar

Best method to fill up this hole by Epoxy grouting then go
after one/two hour for prescribed place of drill. it very simple

Is This Answer Correct ?    1 Yes 2 No

beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy co..

Answer / jamgobi

i have planned to chip both side of concrete to give 1250
mm ,25mm for lablength.

Is This Answer Correct ?    2 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

What is the Density of Steel & Conccrete

7 Answers  


what is the functional requirement of cement plaster in RCC members & masonry?? Is it Manditory to do plastering on all RCC members(beams, Columns, Slabs)? in what places plasterring could be kept as an optional one???

2 Answers   WTE,


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

0 Answers  


dialation means

0 Answers   APGenco,


What is the l/d ratio of cantilever beam?

0 Answers  


for gravel roads in India to get 1feet height how much height we have to fill

0 Answers   Sunrise,


Explain what are the phases inspections are done by local authority while construction?

0 Answers  


What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.

2 Answers   RPP Infra Projects, SIL,


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

0 Answers  


what formula used to find the length of triangle ring in column?

1 Answers   Hitech,


sir, how to calculate steel per 1 m2

1 Answers  


Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)