Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what will happen if delta - star , 400V to 6.6KV step up
transformer neutral is not grounded, Neutral is not used
but transformer is provided with neutral.

Answers were Sorted based on User's Feedback



what will happen if delta - star , 400V to 6.6KV step up transformer neutral is not grounded, Neut..

Answer / ahmad abu alrob

In princible two things may happen during fault condition
or unballance loading:

1- No earth fault protection will be operated.

2- Any Phase/ Neutral voltage could reach the value of
Phase/ Phase voltage in magnitude.

Is This Answer Correct ?    5 Yes 0 No

what will happen if delta - star , 400V to 6.6KV step up transformer neutral is not grounded, Neut..

Answer / raghavendran

If the system neutral is not grounded then during unbalanced
condition or during any faulty condition the excess current
will flow through the phases.During the condition of neutral
shifting the the current will flow into the system
itself.This will lead to damage to the equipment and the to
the personal working with the system.

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

What is Avg. Power Consumption of 2 TR Split A/C???How v can calc. this???

1 Answers   Emerson,


can we use IGBT as a AC-DC converting device in the applications?

2 Answers  


Why Drives are used to run AC motors?

3 Answers  


what is the difference between fc-tcr and tsc in facts

3 Answers   SCET Shadan College Of Engineering and Technology,


Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.

0 Answers  


Mention the disadvantages of low power factor? How can it be improved?

0 Answers  


What is the lockout relay

0 Answers  


why does connected a indutor with mnsformeretering core of current transformer ?

0 Answers  


does a DG set has low fault level as compared to that of a transformer.If yes then why.

0 Answers  


What is primary and backup protection?

0 Answers  


how to calculate 3 phase clearance in Tower line , 33& 11 KV Line and LT Line.

1 Answers  


What are your future plans for the company if permanently employed?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)