What is a formula to decide the size of the cable of the
star delta motor ( From Contactor to the motor 2 runs )

Answers were Sorted based on User's Feedback



What is a formula to decide the size of the cable of the star delta motor ( From Contactor to the ..

Answer / s.sam jeba singh

pls e-mail me also my email id samjeba86@gmail.com

Is This Answer Correct ?    1 Yes 0 No

What is a formula to decide the size of the cable of the star delta motor ( From Contactor to the ..

Answer / lakhvinder kumar

pls send me anser on my id my id is lakhi_khare@yahoo.com

Is This Answer Correct ?    0 Yes 0 No

What is a formula to decide the size of the cable of the star delta motor ( From Contactor to the ..

Answer / gkmohan

dependingonthe k.w motorloadcurrentcontactorside spaceof
wireing outside length ofthe cabledepend loadccurrent
longlife price expence

Is This Answer Correct ?    0 Yes 0 No

What is a formula to decide the size of the cable of the star delta motor ( From Contactor to the ..

Answer / sudhir ubale

Pl send me ans on email id

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why induction motor having low power factor at starting time and high at full load.

6 Answers   BARC, HPB,


A Generator is in running condition and Rotor earth fault alarm is coming.How to check on line(i.e in running condition) whether there is actual earth fault in rotor or not.

4 Answers  


Which circuit breaker arc quenching time is low AC or DC breaker?

1 Answers   Deltech,


I am about to write exam in RRB bangalore for the post of section engineer.please provide me with previous exam questions

0 Answers   Wipro,


What is means by MacAdam Ellipse?

1 Answers  






what parameters should we check to reduce the power bill

0 Answers  


Transfer of electric power from primary to secondary in a transformer takes place A electrically B magnetically C electro-magnetically D conductively

2 Answers  


How much load can take a 16 mm aluminum cable 3 phase

0 Answers   L&T, Sanga Energy,


WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL

0 Answers  


what do you know about SERVOMOTOR

4 Answers  


How to calculate battery back up time for a 400 AH battery bank installed in telecom shelter for a load of 20 Amps and time taken to fully charge this battery bank?

3 Answers  


What is difference between unity power factor wattmeter and upper power factor wattmeter? In short circuit test of transformer the wattmeter used is unity power factor type or upper power factor type wattmeter?

0 Answers   Jindal Steel and Power,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)