how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?
Answers were Sorted based on User's Feedback
How do you determine or evaluate success?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
comparision difference between GSB and WBM subbase in road construction
lap lenth
How to calculate productivity of construction equipment like excavator, dozer, rock breaker, riper
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
whats the field test of cement,aggregate and water
1)What is the maximum size of aggregate that can be used for M-50 grade concrete ? Code teh authority?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
what is a pretension and post tension with an example
Whats the size cube
2 Answers Shimla Hills Construction,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)