Hi friends I am a service engineer in electrical field i
plan to shift design engineer in same field, so i request
your suggestion for what software or course i want to
learn ?
Answers were Sorted based on User's Feedback
Answer / john
Basic is Auto cad 2007 or 2009.Then you can learn Elecdes
and Paneldes(Newzealand ).It's mainly used for switchgear
industry.It's cannot work alone,Elecdes is Autocad suportted
software.courses not available in Computer Center.They'll
give training through the company.sales office at
Chennai.other software Eplan.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / john
Hi kumar,i have no idea about this.Some MNC companies(Like
Areva)are using.you can download thorough their
website,available demo movies in that software.you can learn
through demo if you interested.I hope you can do.first learn
cad2007.then go to elecdes.all the best....
send mail id.
http://www.elecdes.com/
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / syam mohan
hai kumar i suggest you to study electrical cad
| Is This Answer Correct ? | 0 Yes | 0 No |
how to interlock 3 incomer-ACB,1 buscoupler ACB,... pls answer this question and if possible send me the ckt diagram..haifriends2910@gmail.com
why the generating voltage in India is 11kV or why is it be transmitted as multiples of 11
34 Answers ACC, Bhel, ECI Engineering and Construction, NTPC, SBL, Senthur Power Services,
What are the causes of motor vibration?
Tell me about Simence PLC 'BLOCK'.How many types and what for.
how many earthing required for ups, what should be the earth voltages
when we r using 3.5 cable for a bldg. and put laod on each phase using the neutral and neutral is the return paht for the phase so the current of the neutral must be Ir+Ib+iY (return).But the size of the netural is .5 as comper to the phase.
What should be the DC voltage for Hi-pot test on 11kv switchgear
I HAVE A INCOMING 100A MCCB TPN 25KA, CABLE LENGHT OF 80M 70MM CABLE SIZE FROM MAIN SUBBOARD TO NEW DB.BASE ON THE FAULT LEVEL SETTING OF 45KA.I WOULD LIKE TO FIND OUT 25KA ENOUGH KA. APPRECIATE IF SOMEBODY CAN ASSIST ME WITH FORMULA FOR THIS. FRM: JEFF
what happens when back feeding supply accidently collapses with normal supply ??? How?? [that is sometimes in a substation 11kv feeder if their ws long time permit work, back feeding supply will provide from nearest substation... if accidently after the permit work,they charged the feeder without removing back feeding wat will happen...?]
why we use lamination or layer by layer cor used?
Wghat is D-curve MCBs
What is the basic principle of operation of alternators/dc generators?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)