Answer / ajinkya
What is the meaning of Fe in Fe415 grade reinforcement steel?
Updated Answer
The abbreviation Fe stands for Ferrous material ie iron from which the reinforcement steel bars are manufactured.
The reinforcement steel bars used in RCC (Reinforced Cement Concrete) are designated in grades of Fe250, Fe415 or Fe500 depending on their Yield Strength. (The numbers 215, 415 and 500 tell about this Yield Strength in N/mm2 the bars are designed and manufactured to have.)
Fe415 indicates that the Yield Strength (tensile strength when it is subjected to elongation) of steel is 415 N/mm2.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / balraj ram
fe means Flexural Elongation 415 indicates yield strength of steel
| Is This Answer Correct ? | 2 Yes | 1 No |
What is "Bending moment"? Demonstrate on theory not for formula.
What tor stands for in tor steel?
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
how to do soil testing briefly with details
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How many bricks will be fit in one cubic meter, if the brick measurement is 0.20cm X0.08, If you also write down the formula for this question too.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
WHAT IS MEANT BY AEOLIAN SOIL?....
4 Answers L&T, Totem Infrastructure,
we are use us steel in PQC road
What is soil enforcement?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)