Answer Posted / cbsrinivas
i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71
| Is This Answer Correct ? | 4 Yes | 34 No |
Post New Answer View All Answers
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
plumbing CPVC fitting FTE Brass full form
What is the tensile strength of wood?
Explain what is zoning permit?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What are the reasons for geotechnical site investigations in uganda?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Test procedure of fly ash bricks as per code ?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what is the function of GSB all class ?
what r the precaution for high in atp tempareture,low in atp tempareture
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
In cement making,what is meaning of blend,fineness,density.