Answer Posted / cbsrinivas
i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71
| Is This Answer Correct ? | 4 Yes | 34 No |
Post New Answer View All Answers
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
How to calculate canal slope curvature qty!
Why do you want to work here
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
What is Rankine Cycle?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Explain the different types of building contracts?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
how to calculate steel for slab or footings?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
what is the list of building construction equipment & teir output?
Why are steel plates inserted inside bearings in elastomeric bearings?
States some of the tool bars used in cad?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?