What is DCS and PLC scanning time?
Answers were Sorted based on User's Feedback
Answer / abhishek
Main difference between DCS and PLC is about the scanning
time. PLC's have a fixed scanning time whereas DCS
execuation order(scanning) can be varied with certain
minimum limit. Generally a PLC can have a scan rate of as
low as 5msec(fixed) to some where around 20msec(fixed). As
DCS handles larger number of inputs/outputs its scanning
rate is 50msec and this value needs to be defined (can be
kept more than 50msec) while writing a program. But latest
DCS can have scanning rate of 20msec.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / vijay
Scan time is time required for checking i/p,to executive
program and give out put.generally 5msecfor plc
| Is This Answer Correct ? | 9 Yes | 8 No |
Answer / abu maryam
scanning time:
In general: scanning time: it is the time taken to read all inputs then execute the program and apply on outputs.
In PLC: it is only 1 processor check the previous procedures so its scan time depend on the quantity of data and program.
In DCS: There are several processors each processor has its inputs and outputs and its private program so each processor in DCS has its private scan time applied on each loop.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / srikrishnan
SCANNING TIME OF PLC DEPENDS ON THE NUMBER OF RUNGS, JUMP
COMMANDS, SUB ROUTINES, AND INTERFACING DRIVER
CONFIGURATION. THERE IS NO FIXED SCAN TIME FOR PLC.
| Is This Answer Correct ? | 2 Yes | 3 No |
How can I read the electrical drawing easily?
What is difference between converter & transducers?
What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.
During the design and engineering of a process plant, a good designer should plan for ____________, ___________ and ____________ aspects of the plant
IS there any effect of vortex in low pressure side of the transmiter after the orific in feed water line? if yes then what is the calculation?
How much voltage we are using at switches?
i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....
we have LPG spherical Tank and we want to install DP Xmtr for level measurement.below are the physical measurements Total height of tank is 1850 mtr but 0% level is 1000mm above bottom and 100% level is 450 below upper side.What is the LRV and URV and please mention the formula .The SG of LPG is 0.53 and Wet Leg method will be used.
What is the purpose of MATLAB?
Define magnetic flow meter and mass flow meter.
What denotes the 5/8mm in the 3300XL 5/8mm proximitor probe?
Programmable Logic control.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)