Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate cement mortor for wet and dry mix for
different ratios



how to calculate cement mortor for wet and dry mix for different ratios..

Answer / vijayaraj24

1 cubic meter wet mix requried 1.54 cubic meter of dry mix.we
have to use the formula for finding cement,sand,jelly.
for finding cement 1.54 x c/c+s+j we can find the quntity of
cement for different types of ratios

Is This Answer Correct ?    4 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

Machine mix is better than hand mixing to get––

3 Answers  


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

0 Answers   Biswas Enterprises,


what are the types of dams

3 Answers  


what is meant by civil engineer?

2 Answers  


How to calculate cement quantity in m20 concrete

2 Answers   nnovative Constructions, Shapoorji Pallonji Group(SPCL),


Of all curing compounds available, can they use compounds with micro silica in lieu of water? Why?

1 Answers   Saudi Aramco Shell Refinery Company SASREF,


What is an inverted beam??

7 Answers  


what is the quantity of cement sand and metal in a 1m^3 m15 standard concrete

2 Answers   CCE, NCC,


after temping in cbr mould keep how many hours mould in water

2 Answers  


how much minimum steel provide in column

4 Answers  


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

0 Answers  


what is the difference between sill beam,Tie beam and plinth beam?

2 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)