Answer / sjtbehera
Compaction is the process of increasing bluk density of
soil, sand or aggregate by driving out of air.For any soil
on a giving amount of compactive effort , the density
depend on the moisture content.
type of test 1. pynometer test
2. Proctor test
| Is This Answer Correct ? | 21 Yes | 1 No |
Answer / manjunath.bidikar
# 1
Compaction is the process of increasing bluk density of
soil, sand or aggregate by driving out of air.For any soil
on a giving amount of compactive effort , the density
depend on the moisture content.
type of test 1. pynometer test
2. Proctor test
| Is This Answer Correct ? | 7 Yes | 5 No |
How much wastage we considered for cement
What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a stndard size of 440x215x100?
what is the meaning of m35 grade concrete ?
2 Answers Aparna Constructions,
how many cubic ft. for 50 kg ( 1 bag ) cement?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
DESIGN PROCEDURE OF THE COLUMNS
strength vs shape factor
what's the formula for calculate pcc for matt(45mm aggregate)?
Which IS code is saying the detail of deshuttering period?
For Wet Mix Mecadam design what is Optimum moisture content
what is tie beam? & its function . uses of tie beam.
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)