Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the procedure to calculate the compaction of sand?

Answer Posted / sjtbehera

Compaction is the process of increasing bluk density of
soil, sand or aggregate by driving out of air.For any soil
on a giving amount of compactive effort , the density
depend on the moisture content.
type of test 1. pynometer test
2. Proctor test

Is This Answer Correct ?    21 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the different types of building contracts?

1094


Design a rectangular channel.

2904


wat would be the probable interview questions and GD topics for IOCL exam?

9792


if the nitrates more than 45mg/l in water lead to disease then what is it called

2912


Why does the pressure increase under soil?

1264


Define What are the uses of Groynes?

1176


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2258


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

2355


Describe Briefly The Various Methods Of Concrete Curing?

1097


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

2543


What is the cost difference between site mix and ready mix concrete per cubic meter

1873


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

2711


How to do rate analysis for concrete work including shuttering work?

2038


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5610


How to arrive dry volume of concrete (1.52 to 1.57) ?

2338