As a tester how we resolve defect leakage? And how it
occures?
Answers were Sorted based on User's Feedback
Answer / sunitha.chenna
Defect leakage occurs when the tester misses to identify the defect during the testing phase and are encountered during the later stages is generally referred to as leakage of defects.
Tester should be very careful in identifying the defects in the testing phase while doing functional, regression testing etc..
Root cause analysis will be done to the defects that are found during the production or during the UAT. If the defect exists during the FT builds and is not encountered by the tester, then it is called a DEFECT LEAKAGE.
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / ramprasad.s
HI
Defect Leakage: Defect slips out or leaks out from Testing
cycle during FT,Reg,etc.
But End user identified the defect during ( U A T ) or
during usability of the application we call it has Defect
Leakage.
| Is This Answer Correct ? | 1 Yes | 0 No |
How do you develop a test plan and schedule? Describe bottom-up and top-down approaches.
at which movement we will perform varification testing & Validation Testing , with Example ??
How will you give estimation when preparing Test Plan
1. When you consider employing a failure mode and effect analysis?
Which was the most interesting bug you found.
diff between re & regression who will decide priority
2.How should we post the bugs, Difference between priority and severity, Difference between sanity and smoke testing and Problem faced during development - please mail the answers to my mail id thanu_santo@rediffmail.com
Have u ever done testing related to a database,give examples to support u r answer.
wht is Defect removable efficiency
FTP is a application program to upload files to server write a test cases to check the system after successfull uploading we get the message files uploaded successfully?
why u need peer review doc ?
table X havng 3 column A,B,C....A column havng data 10 20 30.....now i wanna have 1o value in A columns all three rows