Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I have CNC Turning lathe,while doing electrical preventive
maintenance what should I do & please brief me plan &
shedule for the same.



I have CNC Turning lathe,while doing electrical preventive maintenance what should I do & plea..

Answer / a.b.utturkar

pl do earthing properly and if neutral shifted then connect
to another earthing. you will get mini. en voltage

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

Is there any reason that we get shock on touching phase wire because the earth is at neutral potential? Is there any reason that the earth is at neutral potential because the neutral is earthed in apower station

0 Answers  


what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?

0 Answers  


How can you sized or estimate the ligthning arrester current rating?

0 Answers  


size of condotory fron voltage level

0 Answers  


which subject is better to tell when hr asks the area of interest?..

0 Answers  


why total tape position are odd in number in Power transformer ?

1 Answers  


what is p.s impedance measurement test in earthing transformer?

0 Answers   Greenko,


how ups works ? various parts of ups and working principle

0 Answers   Serco,


What is power factor why we should maintain the power factor unless what will happen

0 Answers  


What is the minimum insulation value required for a cable between phase to phase and phase to earth of 380 Vac 50Hz circuit, having load arround 800 amps.

2 Answers   DEWA, TATA,


What is the difference IN MCCB's between thermal magnetic and electronic tripping system ?

0 Answers  


How much minimum insulation required between 11kv/3.3kv transformer windings?

0 Answers   Descon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)