what is MIS (related to planning tools)
Answer Posted / divya
Its management information system. It as done monthly & is
obtained from the DPR(daily progress report) collection of a
month.
| Is This Answer Correct ? | 10 Yes | 3 No |
Post New Answer View All Answers
all technical question
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
Describe Briefly The Various Methods Of Concrete Curing?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to calculate the steel in 500yard
What is the standard volume of pharma in cub ft
how to calculate load bearing column
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what is thumb rule for calculating the size of ISMB required for a particular length of span
What are the applications of the modulus of elasticity?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what is tension column?
how we check the thickness and line of ceiling plaster.