How to check percentage of bulkage of sand in RCC?
Answer Posted / suresh
this is not answer.
my question ... first we check and give moisture correction.
this is ok. in that same time why we have required of
bulkage of sand..?
bulkage of sand: we have using only volumetric based place
not in weighement location.
| Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
How to do bbs in excel format
what is the mix design for M:60 with micro silica andmetakaoline?
what is the difference b/w full length and cutting length?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How to fix toll charge for a particular vehicle at toll booths in a highway?
What is the difference between 53 grade and 43 grade cement
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What are the advantages of building a dam on the river nile?
Describe the role of independent Quantity surveyor?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column