Answer Posted / vicky
Developement length is the length of the bar reqd to
transfer the force in the bar to the surrounding concrete
through bond.this length of embedment of bar beyond the
theoretical termination point is required so that the bar
doesnt get pulled out.
Ld = 0.87fy X dia of bar / 4 X design bond stress
| Is This Answer Correct ? | 20 Yes | 4 No |
Post New Answer View All Answers
What is the diameter of the 3"inch nails?
What do you understand by “preset” during the installation process of bridge bearings?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How is improve my knowledge in construction industries....
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
why do we provide haunches in rcc box or underpasses?
What is semirigid connections?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Questions related to civil.engg in company
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Floor tile measurement? Wall to wall or skirting to skirting