Answer Posted / vicky
Developement length is the length of the bar reqd to
transfer the force in the bar to the surrounding concrete
through bond.this length of embedment of bar beyond the
theoretical termination point is required so that the bar
doesnt get pulled out.
Ld = 0.87fy X dia of bar / 4 X design bond stress
| Is This Answer Correct ? | 20 Yes | 4 No |
Post New Answer View All Answers
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how many spacers we need for 1 ton reinforcement? aprox.
How can we make a hole in a solid rectangle using solidsworks?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What in your past experience or education prepares you for the position for which you are applying
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
what will be price of 1:2:4pcc per kg?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
What is the origin of name railway sleepers?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
What is the compressive strength of fly ash bricks?
Explain creep?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
what is cement wastage percentage in NHAI ROAD WORKS