Answer Posted / p.maheswaran
To getting more bonding strength between reinforcement and concrete.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
I have an span length 16 ft c/c
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is Heavy Concrete & Normal Concrete
Explain moment of inertia and its importance.
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
The foundations are placed below ground level, to increase?
what is the breaking strength of wall tiles
Calculation of curtain wall of box culvert
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what are the ffactors you considered choosing the course?