1 no. 22 kV feeder is taken from state electricity board.
350 MVA is the S.C. MVA.
now i am feeding this feeder to HT Panel having 2 outgoings
which further supply to 2 Transformers.
Can you please suggest me the type & rating of cables

are 3 of these cables same?
or they are different?


please help...............

Answers were Sorted based on User's Feedback



1 no. 22 kV feeder is taken from state electricity board. 350 MVA is the S.C. MVA. now i am feedin..

Answer / msbheda

please help..........

Is This Answer Correct ?    1 Yes 0 No

1 no. 22 kV feeder is taken from state electricity board. 350 MVA is the S.C. MVA. now i am feedin..

Answer / latesh patel

2 Runs of 300 Sq.mm. cable will be sufficient for the 22KV
side incoming and the same will at outgoin side
irrespective of load connectd till the voltage level
changes to till lower 11 kv or 415 means txr should come in
picture...

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

what is meant by transformer oil temparature

3 Answers   Vijaya Bank,


WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?

0 Answers   L&T,


What is the difference b/w earthing & grounding?

6 Answers  


how to select earthing wire? procedures and parameters?

2 Answers  


What is touch potential and step potential?

0 Answers   IRI,






why booster transformer is used in sumpners test conducted on transformer????

0 Answers   Cooper,


We have one Energy meter for Measuring the voltage,current,power,energy(KWH,KVARH,KVAH) & power factor.The problem is that the meter does not show whether the PF is lagging or leading.So i want to know that is there any way or calculation to find out that whether the PF sign (lagging or leading) depending upon the above mentioned parameters?

4 Answers  


How to calculate the Short Circuit Impedance in Transformer?

3 Answers  


What is the effect of pd controller on system performance?

0 Answers  


Waht will happened if reactive power increase in the line? waht about active power increase too?

3 Answers  


2.5mva transformer is installed in our company with oltc but it is not working in auto mode ,it is operative in manual mode control wiring is done how can i rectify it?

5 Answers   Imdaad,


i want to trigger ATS (Mains +Generator )from external system could any body help me in this regard ?? is it posible if yes please tell me how?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)