What is control valve ?
Answers were Sorted based on User's Feedback
Answer / ramit sharma
Control valves are used to control conditions such as
flow,pressure,temperature and liquid level by fully or
partially opening or closing in response to signals
received from controllers that compare a setpoint to a
process variable whose value is provided by sensors that
monitor changes in such conditions.
The opening or closing of control valves is done by means
of electrical,hydraulic or pneumatic system.
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / anish
valve is a device used to either control the flow rate or
to fully shutdown flow a control valve is automatically
controled either pneumatically or current(solenoid valve)
| Is This Answer Correct ? | 5 Yes | 1 No |
ENGINEERING PHYSICS - EXAMPLE 30.5 : (a) Let | A > = (Aa Ab Ac), | B > = (Ba Bb Bc), | C > = (Ca Cb Cc). Find | A > + | C > - | B > in term of Aa, Ab, Ac, Ba, Bb, Bc, Ca, Cb and Cc. (b) Let d | E > = d (Ea Eb Ec) = (d Ea d Eb d Ec). If | E > = (6 7 8), find the value of 10 | E >.
why PH scale range is 14? why it is not less or not greater than 14? solution of HCl or hydrogen containing liquid has a PH. but if the solution is KMnO4 here not hydrogen power does it PH? explain plz....
what is the differance between Horizental and vertical heat exchanger?
11 Answers Bihar Caustic and Chemicals,
Explain the different ways in which solids can be blended?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.32 : In the calculation of the total cost of production of an engineering material, a linear equation Y = MX + C could be applied. Let T = total cost, F = fixed cost, V = variable cost, Q = quantity produced, W = variable cost per unit produced. Form a linear equation that relates : (a) T, F and V; (b) V, Q and W.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.13 (CORRECTION) : (i) In the Present Value Multiplication Rule, let PV = present value, Ra = interest rate for first discount, A = duration for first discount; Rc = interest rate for second discount, C = duration for second discount. Let PV = [ 1 / (1 + Ra) ^ A ] [ 1 / (1 + Rc) ^ C ] where ^ is the symbol of power : 3 ^ 2 = 3 x 3, 2 ^ 3 = 2 x 2 x 2. (a) For discounts involving 8 % / year for 3 years and 10 % / year for 9 years, find the value of PV. (b) If Re = interest rate for third discount, E = duration of third discount, form a mathematical equation of PV as a function of A, C, E, Ra, Rc, Re. Note : Discounts are available in the purchase of certain biochemical engineering instruments. (ii) Let R = nominal interest rate related to growth rate of money, r = real interest rate related to growth rate of purchase power. If I = inflation, where the unit of R, r and I is %, find the mathematical relationship of r as a function of R and I.
What type of pump may be appropriate for a liquid near saturation, a low flow rate, and very limited npsha (net positive suction head available)?
Explain how does a tank-blanketing valve operate?
Define "good" cooling tower water?
ENGINEERING DRAWING - EXAMPLE 18.1 : For a Vernier scale of representative fraction (RF) = 1 / 25, calculate the length of the scale for the reading up to 4 metres.
plz send the interview questions in the written test asked by hindustan petroleum corporation ltd.Iam a b>tech in chemical engineering.My written test is on feb 2008.urgent plz.send the questions to indra_bits10@yahoo.com
i need sample question paper of hpcl entrance exam... in chemical engneering category... please mail me to mychitti07@yahoo.co.in
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)