ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.13 (CORRECTION) : (i) In the Present Value Multiplication Rule, let PV = present value, Ra = interest rate for first discount, A = duration for first discount; Rc = interest rate for second discount, C = duration for second discount. Let PV = [ 1 / (1 + Ra) ^ A ] [ 1 / (1 + Rc) ^ C ] where ^ is the symbol of power : 3 ^ 2 = 3 x 3, 2 ^ 3 = 2 x 2 x 2. (a) For discounts involving 8 % / year for 3 years and 10 % / year for 9 years, find the value of PV. (b) If Re = interest rate for third discount, E = duration of third discount, form a mathematical equation of PV as a function of A, C, E, Ra, Rc, Re. Note : Discounts are available in the purchase of certain biochemical engineering instruments. (ii) Let R = nominal interest rate related to growth rate of money, r = real interest rate related to growth rate of purchase power. If I = inflation, where the unit of R, r and I is %, find the mathematical relationship of r as a function of R and I.
ACCOUNTING AND FINANCIAL ENGINEERING - ANSWER 34.13 (CORRECTION) : (i) (a) Let Ra = 0.08, A = 3; Rc = 0.1, C = 9. Then PV = [ 1 / (1 + Ra) ^ A ] [ 1 / (1 + Rc) ^ C ] = [ 1 / (1 + 0.08) ^ 3 ] [ 1 / (1 + 0.1) ^ 9 ] = 0.33666. (b) PV = [ 1 / (1 + Ra) ^ A ] [ 1 / (1 + Rc) ^ C ] [ 1 / (1 + Re) ^ E ]. (ii) r = R - I. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
| Is This Answer Correct ? | 0 Yes | 0 No |
Why is post-weld heat treatment sometimes necessary for welded vessels?
QUANTUM COMPUTING - EXAMPLE 32.2 : (a) If | 001 > = | 1 >, | 111 > = | 7 >, find the 2 possible values of ( | 001 > + | 1 > + | 7 > ) ( | 111 > ). (b) In quantum money, a duplicate will have probability P of passing the verification test of a bank, if the total number of photons on the bank note is N. The would be counterfeiter has a probability p of success in duplicating the quantum money correctly for each photon. Guess the relationship of P, p and N as a mathematical formula involving natural logarithm ln.
Explain global warming from a common man's and an engineer's perspective?
Who built the first production scale pla (polylactic acid) facility?
CHEMICAL ENERGY BALANCE - EXAMPLE 11.1 : Please match the term A - E with the stated definition i - v. Terms : A. Yield. B. Selectivity. C. Relative saturation. D. Molal saturation. E. Absolute saturation. Definitions : i. (moles of desired product formed) / (moles that would have been formed if there were no side reactions and the limiting reactant has reacted completely); ii. (moles of desired product formed) / (moles of undesired product formed); iii. (relative humidity 40 % means partial pressure of water vapour equals 4 / 10 of the vapour pressure of water at the system temperature); iv. (moles of vapour) / (moles of vapour dry gas); v. (mass of vapour) / (mass of dry gas).
CHEMICAL ENERGY BALANCE - EXAMPLE 11.5 : According to Margules Equation, P = x(1) p(1) g(1) + x(2) p(2) g(2) for a two-component mixture where P is bubble pressure, x is mole fraction, p is saturation pressure, g is constant given by ln g(1) = x(2) A x(2). Find the value of A as a constant when P = 1.08 bar, p(1) = 0.82 bar, p(2) = 1.93 bar in a 50 : 50 mole fraction mixture. Estimate the pressure required to completely liquefy the 30 : 70 mixture using the same equation, by proving P = 1.39 bar. Take note that ln g(2) = x(1) A x(1), ln g(1) = x(2) A x(2).
How can I remove/decrease TDS from sewage waste water? At the moment it is 900gm/l. What is recommended TDS level to dispose sewage water in sea?
why is cross over inlet provided in a furnace?
which is the major cement producing state in western India ?
send me previous year question paper for ongc gt 2011 written exam
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.26 : In a construction accounting for a biochemical processing plant, $A has been spent to date, and another $B is expected required to complete the construction project. The biochemical processing plant is expected to generate a total revenue of $C. Calculate the : (a) estimated total costs; (b) percentage completion of project; (c) total estimated profit; (d) profit to date.
While there, are many tests available to detect leaks on vessels, is there a technology available to quantify the leak, or measure the flow through a leak?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)