Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


can any1 mail me IS CODES and quality check sheet of
materials..? its urgent plz

Answers were Sorted based on User's Feedback



can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz..

Answer / santosh singh

i can mail u just give me ur email id

my id is santosh29civil@gmail.com

Is This Answer Correct ?    3 Yes 0 No

can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz..

Answer / amitabh joshi

give ur mail id , code no ,specification for quality checking

Is This Answer Correct ?    0 Yes 0 No

can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz..

Answer / sjtbehera

give me Rs 1000( one tousand only) i will courrior you to
following codes
1. IS Code 456-2000
2. Sp-36
3. earthquake load
my no-9437310082

Is This Answer Correct ?    3 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

how we control the temperature during concreting ?

4 Answers  


How many types of slabs are there & how to design it?

0 Answers  


granite tiles laying 60/sq ft.how to convert in sq mt,what is the mltiplying value.

5 Answers  


Define What are the materials used in building a gravity dam?

0 Answers  


how we can calaculate cutting lengh for stiruups 6mm dia . column size 20 cm x 30 cm, cover 20mm

8 Answers  


What is the exact meaning for under & over reinforced beams & when they have to used..

11 Answers   Gammon, L&T, MEIL,


waht is the range of compacting factor test result for good concreate?

1 Answers  


rate analysis of shuttering

2 Answers  


What is the development length given in pile?

0 Answers  


A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx

1 Answers  


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

0 Answers   Bhel,


What do we mean by partial moment release ??

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)