How to do lineout of building
Answers were Sorted based on User's Feedback
Answer / swagatam maharjan
by using total station with reference to known coordinates (x,
y & z) of traverse point established on the basis of GPS and
coordinates points of building
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rupesh
by using thedolite we take horizontal distance,angle.
Is This Answer Correct ? | 1 Yes | 0 No |
how much cement consumption in box type waterproofing
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
what are the major benefit in auto level?
What is the usage of zoom command?
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=
If a 12m main road straight is adjoined from both sides by 7.5 m road , how curves are given at corner for vehicle movement (measurement pls.)?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
NP3 CLASS HUME RCC PIPE
In built up area basis what is ratio of concrete
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
what are RIB slabs explain about it
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water