How to do lineout of building
Answers were Sorted based on User's Feedback
Answer / swagatam maharjan
by using total station with reference to known coordinates (x,
y & z) of traverse point established on the basis of GPS and
coordinates points of building
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rupesh
by using thedolite we take horizontal distance,angle.
| Is This Answer Correct ? | 1 Yes | 0 No |
How to activate isometric axes in cad?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
Is there any possibility of changing in dia of bar from lower to higher (i.e Lower dia bar at bottom and Higher dia bar at top)
What is "L" provided at the base of column??
how did find the quantity of cement ,sand , and aggregate in concreat which is givan by volume
What are the advantages of cad software’s?
How many cncrete grades are used for construction,explain with proportion,grades and where it used
How to layout the site plot ? Method with explation
mix design procedure for 1:6 cement mortar
what is the difference between site engineer & site incharge
What is Curtailing of R/F
What are the causes of failure of foundations and remedial measures?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)