Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WHY WE USE CABLE JUNCTION AFTER BETWEEN TANSMISSION LINE
AND TRANSFORMER



WHY WE USE CABLE JUNCTION AFTER BETWEEN TANSMISSION LINE AND TRANSFORMER..

Answer / pritish

junction cable is placed in between the trans. and a sub station due to the following reasons.
when a high voltage surge fall on the transmission line it propagates to the either side of the tr. line. we know that the surge impedance of a transmission line is nearly 400 ohm and the surge impedance of a cable is 40 ohms. hence when a surge comes to the sub station from tr. line, the magnitude of surge voltage decreases to a great extent on the cable side due to voltage divider rule. hence the equipments in the SS can be protected.




for details contact :pritish.nath@gmail.com

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor

0 Answers   Viva,


WHAT IS THE DIFFERENCE BETWEEN NEUTRAL AND EARTHING

1 Answers   Adani, Adani Power, Raychem RPG,


Why neutral has to switch on-off with phase in TN IT TT systems i.e neutral should be taken as fourth pole

1 Answers  


what is our body resistance value?

11 Answers   Bhel,


can any tell me why slope 40% and 80% is calculated in differential protection?

0 Answers  


if we put a energy meter in 500 kvar capacitor bank ,then how much units show in energy meter per day.

2 Answers  


33kv substation lay out details & line to line & line to earth measurements

0 Answers  


Why L.T.Cable voltage rating is 1.1kV,where as system voltage is 0.415kV?

0 Answers   HCC,


Which type of power plant is more easier to produce electrical power at economical condition?

5 Answers   HAL,


does buccholz in a transformer use batteries

2 Answers  


what is Fault level? why it is calculated? how will u decide same for our plant?

0 Answers  


for a slip ring induction motor if the stator is short circuited and rotor is given supply? how does the rotor rotate?

1 Answers   TNEB Tamil Nadu Electricity Board,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)