i have a Connected Load of 280KW and Maximum Demand of
224KW to one of SMDB under design with me.
which criteria should i consider to design panel and main
cables connected Load or Maximum Demand
1)Breaker rating
2)Panel Busbar rating
2)Incommer cable sizing (ignore Voltage drop)
Answer / satyam
As the maximum demand is less than connected load ,you have
to choose rating of power equipments depending upon
connected load .
| Is This Answer Correct ? | 4 Yes | 1 No |
Can anyone explain me about the RLC based Impulse high voltage generator and how to and operation of Series resonant High voltage reactor...?
what is different between synchronous & asynchronous motors
how many wires need to be bring to the motor if its star delta starter
What is Harmonic affects in power system. what is unit of harmonics and how to measure it. how much value should be in power system.
HARMONICS ARE ALWAYS IN INTEGER LIKE 2ND OR 3RD HARMONICS,NOT IN FRACTION LIKE 0.5 HARMONICS.....????????
What are the electrical engineer roles and responsibilities in chemical plant?
Why does the power consumed is always constant even if a fan speed is altered?
What is bridge rectifier and explain with details
why slipring motor , at full speed run as squirrel cage motor?
what is the difference between UPS and INVERTER?
if we convert kw into kva,which one formula use by us,pls tell me?
19 Answers ABB, AEC, BGH,
What does CDG,CDAG,CAG,VAJ,VAJH,VTT,VAZ,VAA etc. stands for in case of relays and can anyone answer to decode this codes C,V,D,G,A,X,TT,J,JH etc
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)