My previous company dismissed from my job due to some reason. But they have given 1 year experience certification. But i worked for 1 year 4 months, How do i answer if interviewer asked what did you do for six months.why are you leaving your job?
4 8448from which book shud i will prepare for the hpcl and various company exma i m fresher and my basic is not strong could u suggest from where to start
IOCL,
7 15910I want to do Mtech In CHEMICAL ENGINEERING FROM IIT< BUT people say that u dont get enough money, I still want to do mtech but not mba , Please tell me about my future What should i do, I have done B. E in chemical and working as a chemical engineer only , Please guide me COZ MONEY IS NEEDED In todays world but i still want to make my career in chemical engineering
9 21280What is the pattern of interview questions and which field is of high importance viz., Mass Transfer, Heat Transfer, Petroleum Refining etc ?
2 10767plz send the interview questions in the written test asked by hindustan petroleum corporation ltd.Iam a b>tech in chemical engineering.My written test is on feb 2008.urgent plz.send the questions to avazithraja@rediffmail.com
9 16292Post New Chemical Engineering Questions
What types of pneumatic conveying systems are typically used?
Define condensate lift?
Explain what are the criteria involved in choosing mass balances for components?
Explain the factors involved in designing kettle type reboiler?
hi all i have doe cheical engg, but i have to go for iob po interview so can anybody suggest me abt the kind of qns that can be asked.
What is the most common carrier gas used in pneumatic conveying?
What are some common problems associated with bellow expansion joints?
Explain what are some typical applications for glass-lined reactors?
What is a surfactant?
Explain why does catalytic converter used in an automobile?
What are some characteristics of bulk solids that can affect their ability to flow properly?
MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)
How do you design a vapor-liquid separator or a flash drum?
what is load and what are the types of load?
how we can find solubility of liquid in amyl alcohol and relative solubility of amyl alcohol