My previous company dismissed from my job due to some
reason. But they have given 1 year experience
certification. But i worked for 1 year 4 months, How do i
answer if interviewer asked what did you do for six
months.why are you leaving your job?
Answers were Sorted based on User's Feedback
Answer / bhupendra
u just tell them the truth.and b confident dat u get this
job. b aware of those things which will gave any impact of
urs on the interviewer.dont tell them dat u r terminated 4m
job, but show dat u leave the job due to ur domestic
responcibilities or bcoz of company attitude towards an
employee..dis industrial world dosent need wat u have done..
it need that wat u can show..on a piece of paper...
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / swetha
u wud b explaing the reson 4 ur dismisal to the interviewer
without manupulating the reson...and it is very much
essential to analyse wat thing of worth was performed by u
in those 6 months.What comes to ur mind is to b
revealed.this sort of answers wud show ur trust worthyness
and don't tyf to justify urself by giving
reson abt leaving utr job until unless it is asked.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / montu
Dont worry abt this situation and try to get the new
certificate from the company so you can reply to your
interviwer and most valuable thing is dont waste your time
on certificate and non sense matter if you have talent you
will come up like any thing
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sachin rajvanshi
dear, any experience certificate or good marks sheets don't
make u'r career in engineering field.don't emphasise u'r
previous job dismissal from urside.
try to pull it into u'r work exposure and the problem
solving capability in u. the most important thing in
interview is the 50% satisfaction of the interviwver world
wide. no one expect perfection in knowledge.
| Is This Answer Correct ? | 0 Yes | 0 No |
Explain what are the problems that are associated with the expansion joints?
Explain some of the consequences of an undersized kettle type reboiler?
Name some common problems associated with dilute phase pneumatic conveying?
CHEMICAL MATERIAL BALANCE - EXAMPLE 2.5 : In a non-dilute absorber, the inlet gas stream consists of 8 mol % carbon dioxide in nitrogen. By contact with room temperature water at atmospheric pressure, 65 % of the carbon dioxide from a gas stream has been removed. (a) Find the mole ratio of carbon dioxide and nitrogen gases at inlet and outlet gas streams. (b) The Henry's Law provides y = 1640 x for carbon dioxide in water. Find the mole ratio when x = 0.0000427. Mole ratio is y / (1 - y) for y.
What is a 'saltation velocity' and how is it used in designing pneumatic conveying systems?
i want sample inteview question of chemical engg for BARC
Define a surfactant?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?
QUANTUM COMPUTING - EXAMPLE 32.7 : If | ± > = 0.707 ( | 0 > ± | 1 > ), prove that | Ψ (t = 0) > = | 0 > = 0.707 ( | + > + | - > ).
In differential centrifugation of cells with diameter D in centimeter, the square of D is given by D x D = [18n ln (RF / RI) ] / [ (RP – RFF) Wt ] where n is the fluid viscosity (poise), RF is the final radius of rotation (cm), RI is the initial radius of rotation (cm), RP is cell density (g/ml), RFF is the fluid density (g/ml), W the square for the rotational velocity in (radians / s) (radians / s), t is the time required to sediment from RI to RF (s). Derive an equation for W as a function for D, n, RF, RI, RP, RFF and t, with the stated units above, in radian
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.4 : A university is enrolling new students of biochemical engineering degree. A long queue is formed during registration. Let L = rate of newcomers to a queue, m = number of clients served at a certain time, T = time in system. In M / M / 1 queue, let T = time waiting in a queue + service time, L = 2 / second, m = 3 / second. (a) Find the service time, A = 1 / m. (b) Calculate time waiting in a queue, B = A (L / m) / (1 - L / m). (c) What is the value of T?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)