How to calculate current carrying capacity of copper conductor _ such as cable size 25sq mm,50 sq mm, 75 sq mm, 100 sq mm
2 4405What is the difference between diesel generator engine with and without turbo charger with the same capacity?
1639a 440v 60hz 03 phase 100kw generator can deliver how much power in kw for 220v 60hz 01 phase load?
1 2288can we use the 110 v primary Tr 240 v secondary step up Transformer as reverse 240 pri 110 sec
3 4186Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir
1869why generation voltages are 6.6kv or 11kv and why not some one give that stander that generation voltages are 5kv or 12kv?
AES,
1 4004Post New Electrical Engineering Questions
Is it posible to instal one more SMDB from the existing SMDB and is it practical.
Explain the process of commutation in a dc machine.
What is power relay?
why does rotor rotets?
Define delay time.
i want to run 11kv star connected motor in 6.6kv with delta connected throught inverter, is it possible?
HOW DO YOU CAN CHECK A 15KV DIODE, WHETHER IT IS OK OR NOT?
WHAT IS THE CURRENT CARRYING CAPACITY OF 2.5/3 CORE HI TUFF CABLE,WILL IT SAFLEY CARRY 8.6 AMPS OVER 120 METRES,CAN YOU ALSO ANSWER WITH FORMULA FOR WORKINGS OUT ,THANK YOU 3RDYR APPRENTICE.
types of central Air conditioner plant?
Suppose a 3 phase, 2 pole, 440V induction motor is driving a flywheel of 600mm diameter, 150kg mass. By using v-belt and pulley, the speed is increased to 4500 RPM. What will be the effect on motor current?
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?
Difference between shunt, PMG and AREP excitation. Which is the most reliable between PMG and AREP.
Is a contactor (or master relay) required between incoming lines and a VFD? The question goes to safety. If a contactor were used before the VFD and an e-stop engaged then the motor will coast to a stop (i.e. VFD loses power) instead of stopping much faster if the VFD braking fucntion were used. It would make more sense to keep power on the VFD.
What is diversity factor in electric installations?