Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
2655LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
2047what is the purpous of using m50 grade concrete ? why its using ? what is the difference between m50 grade concrete and other grade concrete ? uses of m50 grade concrete?
1 6246what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc
4 63686How to calculate the length of chairs provided to support the top rebar in concrete foundation
2 32200in coarse stone masonry(bela masonry),how many cement bags are used in cement mortar for proportion 1:6
2 5561Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
NTPC,
2261WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
3 6018Post New Civil Engineering Questions
Define What is a projection line?
how calculate the bearing from two coordinates?
Which is stronger solid steel rod or hollow steel pipe?
specifications of fe500 steel
The concrete slump recommended for beams and slabs; is?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
What is the significance of cost estimate knowledge for an architect?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Prepare a Schedule for a Highrised building from starting stage to Handover?
What is kn measurement?
What quantity of 1.0 m3 bricks required?
what is the tensile strength of 10swg and 8swg gabion wire?
how to identify np3 pipe and np4 pipe
what is the theoritical percentage of concrete cubes testing per day?