Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

Why sea sand and desert sand are dont used for construction

1 4686

Difference between ton and metric ton

DHA, ECCI,

3 6731

mechanical efficiency is high in petrol engines compared to diesel engines but why diesel engines are preferred in heavy duty vehicles

Valeo Lighting Systems India Private Limited,

6 10643

Five circle- adjacent to each other in ascending order, first dia 8 and last dia 18, find mid one.

3D PLM,

4 24769

explain double side band and double side band -substrace carrier

1 2020

define quantity of each ingredient in 1:3:6 mix concrete by volume?

NJS, Pratibha Industries,

2091

If you are scientist to b e and you wish to develop a self-generating power appliances, what would b e the ranking of importance to apply your concept of creating energy using alternator: 1. Washing Machine 2. Motor Water Pump 3. Electric Fan 4. Electric Stove 5. Flat Iron – Which one will b e your foremost and the least at the rank of 1 to 5? Why is that so? Defend your answer.

1 1703

why starting current is high and resistance is almost 0 during the starting of motor dc motor...?

1 1800

Why winding temperature ct placed in B-Phase of the transformers?? 

3 4374

on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf  has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure? 

2 3387

what will be hook length of stirrups

Rawabi Fayfa,

7 10527

what is punching force required for embossing of depth 3.5mm and diameter 58mm

Omkar Solar System,

1 2165

How to calculate volume of dry mix concrete?

2173

why the name mho relay,despite the locus of circle is impedance?

KSEB,

1 3488

what is over frequency protection

1 5546


Un-Answered Questions { Engineering }

please send me jindal interview question if any one have?? my id is erabhishekparashar@gmail.com thnx in advance

2183


i want the aptitude test papers of wipro can any one help plz

2009


WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.

2719


Any idea of BSNL, JTO paper?

2138


400 ku d/c clearess ketan hota hai?

2117


dear sir, pls provide me a previous paper for hpcl engineers trainee exam for mechanical engg. this is a request pls do the needful as early as possible.

2033


What is the strength of 1:6:12 mix?

3144


I want previous rrb enteranse exam papers in junior engineer(Signal/Tele/c&w). please send that papers to my id dkg_unnao@yahoo.com

3399


pls, send me jindal steels & power aptitude ques

1970


what can made electronic car by your company?

1920


Question on maha cement

792


Explain the approximate cost of the smart pebbles eci-1(embedded corrosion instrument)?

999


any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com

2026


please send 5yearje solved papers on my email himmatsinghnathawat@gmail.com

2003


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3224