Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

why the rotor is outside in case of ceiling fan?

HCL,

1 5214



TATA,

2148

I installed the smartplant instrument v8, but can not be opened, that always said: "INTools 2007 hardlock no found". So Could you help me how to do for that?

SRAAC,

2058

relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

Infosys, SSC,

1 10273

Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.

1 4816

Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3490

Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..

1 3990

Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.

3 6287

Shall we get the reading on level transmitter only by termination,without commissioning?

1 4225

what shall be no load voltage of 132/33 kV transformer ? is it 33 kv of 34.5 kV

2190

What is the Steel bar spacing formula for Concrete Slab?

B L Kashyap,

4 65754

If the Barrier Fails during online then What will be the control valve position in field or Positioner action in the field.

3 6178

differentiate between c curve and d curve MCBS?

1 3775

How much snowcem required per sq. Meter area

Bhushan Power Steel,

3 20173

what is FPS brick

2 21831


Un-Answered Questions { Engineering }

How can you determine the largest impeller that a pump can handle?

1185


WHAT IS THE WINDING PROCEDURE OF ELECTRICAL MOTOR

3984


What is dc current source? Differentiate between ideal and non ideal current sources?

1475


how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?

1976


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

2440


Of which metal was aryabhatta made?

766


What is fiber?

1


How many VSC based HVDC are there in India and the world

2238


Write a note on materials used as a fuse element.

2126


Dear Sir, I am Shariq Sami. I joined BHEL as a Supervisor Trainee in May 2009 on diploma basis, right now i am an assistant Engineer and posted at Noida. I have completed my bachelor of engineering from Jamia Millia Islami, New Delhi.I am Planning to appear for "BHEL ET" exam this year. I want to know,is there any previous year question papers will be available like we have for GATE exams or you feel it is no need? Can you please guide me? Kind Ragards M.S Sami, Contact No. 9891090742, 9250250988, 0120-2545796

2171


Explain why regeneration is not possible in semiconductor

987


Define hold time?

1340


Explain what is ply yarns?

1


sir,would you please send me the Hindustan petroleum corporation limited papers(HPCL).my e-mail ID is ujjwal_sharma1983@yahoo.com

2325


The process conditions of the fuel gas are as follows: Temperature = 25 deg C Pressure = 4 bar g Calculate the line size for the fuel gas supply line to the superheater

2253