With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2450Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1913Post New Power Plant Interview Questions
What are the differences between decimal and float in ms sql server?
What is maintenance testing?
What is the syntax and use of the coalesce function?
What is the maximum size of a powerpoint file?
What are the 3 types of control structures?
How many layers are in osi reference model?
how to calculate the sand quantity for please work 1:3
Is INSTEAD OF trigger directly applicable to Table ?
Write a program for finding factorial of a number.
What does void mean unity?
Why select is used in sql?
what is the principle used in electromagnetic spectrum?and why there is a necessary of having an electron with unpaired spins?and how the uncertainity principle is used to determine the frequency of an spectral lines ?
Write a program to swap two numbers without using the third variable?
How would you help your team to improve performance?
Define dynamic fields?