With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2450Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1911Post New Power Plant Interview Questions
What are the types of jstl tags?
What is difference between throw and throws in c#?
What are the causes of troubles in boiler during operations?
Difference between null and undefined?
What are the disadvantages of c language?
Why deleted files can be recovered?
What is an ECMAScript?
What is strcpy() function?
How to view clipboard in windows xp?
OPTIMIZATION OF SP,CURSOR,TRIGGERS
what are the preventive maintanance actions taken for air circuit breaker? please answer me
What is java technology stack?
what is the relation between Total organic carbon and Chemical Oxygen demand?
What do the ik08 tcodes in sap- pm mean?
Why you do not refund the customer his money?