With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2499Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1958Post New Power Plant Interview Questions
How to run a query in teradata?
What makes angular.js better?
What are the constitutions of the cell wall of chlorella pyrenoidosa ?
How transaction file different from that of a sort file?
What is yield break in c#?
What is the difference between an abstract class and an interface?
What is xsl in html?
Explain the characteristics of the cmp instructions?
Why do all model object attributes get marked with @dynamic and not synthesised? What does @dynamic mean?
What have you liked or what has surprised you about the technology?
How can we store plant germplasm for future use?
Every block of blockchain consist of what elements?
What are triggers mysql?
how do you enable javascript debugging for the coaches?
Is grep faster than awk?