With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
1943Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1398Post New Power Plant Interview Questions
How can you find out define what kind of stainless steel was used in making a stainless object?
What are various types of sensors used in the robotics?
How is time management and payroll integrated?
Write a program to find the given string in the line?
How do I insert blank rows in excel when values are changed?
What is difference between j2ee and java?
Expand-------SNAT
What is left join example?
we cant write data into file using cl program then what is sndf
What is the difference between namenode, backup node and checkpoint namenode?
What is a deadlock and mention how it can be resolved?
What is css ict?
How many times can windows 10 key be used?
What does alt do in word?
What is the difference between the c and d drive?