With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2445Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1897Post New Power Plant Interview Questions
Explain the foreign key?
What is the purpose of ios::basefield in the following statement?
What are the differences between the constructors and methods?
Why should I care about search engine marketing?
What are prerequisites for r’s c interface?
Is set sorted?
How to capture screenshot in selenium webdriver?
What is the use of PRINTF?
what is the difference between np2 and np3 concrete mix
What is ocm and how to apply ocm patches?
Define xml?
What is your previous work experience?
How do you create a primary key?
How to delete the table with the HBase shell?
can any send unix admin doc? if u have please send it to chanduk29@gmail.com