With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2452Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1914Post New Power Plant Interview Questions
Can I use linux on mac?
What is flush () in c++?
What table type is preferred in SAP HANA Administration: column-based or row-based?
what do your parents think of you?
Is aws paas or iaas?
What is the minimum configuration required for a jsf application?
What is singleton class in java and how can we make a class singleton?
What is a provider method in angularjs?
How you can perform trace, monitoring, error and performance monitoring of jobs in data services?
If we have to create multiple positions, what method or tool we can use to avoid errors due to creating them manually.
Why h1 tag is used in html?
what are all the conversion and interfaces in GL,AP,AR,HRMS with example? otherwise send send link for these
Explain image map?
What is the minimum number of queues needed when implementing a priority queue?
What is the use of stripslashes in php?