With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2499Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1960Post New Power Plant Interview Questions
What is UDDI and how to register the web service in it?
What is symbolic learning?
What are the benefits of the struts system?
What are the advantages of swift?
What is a storage class?
What is the difference between condition & filter?
What is strongly typed in c#?
Define ramp limit in ab initio?
difference between manager access and designer access?
Who can submit applications through the blackberry app world vendor portal?
What is the use of id attribute in html?
Is null in javascript?
Why am I running out of locks on the replicate side in sybase ?
Tell me how does mq support the integration?
Can we store videos inside the sql server table?