With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2445Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1897Post New Power Plant Interview Questions
How does servicing work for the .net framework 3.0?
what are the Types of DBCombo boxes?
What is page attribute module?
Name the numeric constants representing max, min values?
Are exceptions occurring during recovery mode recovered?
What are nil pointers?
Which one will the system generates first, tr or to ?
What are static type checking?
what are the preventive maintanance actions taken for air circuit breaker? please answer me
What is difference between pointer and reference?
Can you create a roll-up summary field in a lookup relation? State the number of such fields to be created for an object.
How do you find the regression equation?
What is the full form of linux and unix?
What is use Array size in datastage
What is a time and motion theory?