WHEN THESE TRANSFORMERS WINDINS CONFIGURATION ARE USED? SPECIALLY EXPLAIN REGARDING STEP UP AND STEP DOWN KEEPING IN MIND.AND REGARDING LOAD ALSO. a.star to delta b.delta to star c.delta to delta d.star to star ALSO EXPLAIN WHY V USE 415/415 TRANSFORMERS IN TUBEWELLS?
ABB,
1 4111.if the vector group of two transformers is not same n tey r connected in parallel operation then what will happen?
ABB,
2 6389why transformer required and why not voltage directly supply from power generation to the applications
3 5703What will happen if 60 Hz rated transformer is connected to the supply of 50 Hz say 415 V (3-phase) step up to 3.3 kV...?? ?
2 7386Though transformer consist winding which usually cause reactive power change in both generator and motor but it wont affect reactive power passing through transformer why?
2 5562In some countries it is found that an Earthing Transformer is connected at the LV sides of the Transmission and Distribution Substation Transformers.Actually what is the purpose the Earthing Transformer?
1 4050how to select diiferent power transformers of same capacity on no load loss and full load loss by economical point of view.?
1 2021
Draw the line diagram of diffretial relay connected to transformer?
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400
I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?
how to avoid electrical shock how capacitor store charges wat are the speed control of induction motors state faradays law flemings left hand rule what is rotary converter wat is transmission and distribution what are the sources of energy abrevation of acb,vcb,sf6,igbt what is output equation of transformer which test copper iron and iron loss are calculated what is eddy current draw a single line diagram (10 marks) draw direct online starter(10 marks)
what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer
1. Tell me about your self? 2. Latest Project Introduction? 3. Difference between server jobs and parallel jobs? 4. Seq-Seq Explain its behavior and execution mode and which parallelism technique is used? 5. What is padding characters? 6. Seq-Seq, Seq-Copy-Seq which one is the best and efficient? 7. How many reject links do we have to a transformer? 8. How many reject links to join stage? 9. Difference between join and lookup? 10. How to design PX routine? 11. How can we call job in another job? 12. Difference between batch and sequencer? 13. Which Database is used? 14. What is change capture? Give briefing of that? 15. What is change Code? Explain? 16. How you call UNIX in Ds? 17. How do you call JCL in UNIX? 18. How do you pass the job status of one job to another job? Have designed any job sequencer? 19. How do you find a file in existed directory? 20. How can you call parallel jobs in transformer? 21. Execution of jobs in command line? 22. Tuning of sql queries? 23. What is orchestrating metadata? 24. What are junk dimension? 25. What are the third party tools you are used? 26. What are the system variables you have used? IBM 1. What is virtual dataset? 2. How do you handle reject link to a peek stage? 3. What is transaction table? 4. Which one is the efficient from the following? a. ODBC enterprise b. Oracle enterprise 5. How can you extract data from excel sheet? Do you know how to parameterize, this option? 6. Six pages of complex query I have, how do you simplify this query? 7. Difference between dataset and lookup file set?
1. Tell me about your self? 2. Latest Project Introduction? 3. Difference between server jobs and parallel jobs? 4. Seq-Seq Explain its behavior and execution mode and which parallelism technique is used? 5. What is padding characters? 6. Seq-Seq, Seq-Copy-Seq which one is the best and efficient? 7. How many reject links do we have to a transformer? 8. How many reject links to join stage? 9. Difference between join and lookup? 10. How to design PX routine? 11. How can we call job in another job? 12. Difference between batch and sequencer? 13. Which Database is used? 14. What is change capture? Give briefing of that? 15. What is change Code? Explain? 16. How you call UNIX in Ds? 17. How do you call JCL in UNIX? 18. How do you pass the job status of one job to another job? Have designed any job sequencer? 19. How do you find a file in existed directory? 20. How can you call parallel jobs in transformer? 21. Execution of jobs in command line? 22. Tuning of sql queries? 23. What is orchestrating metadata? 24. What are junk dimension? 25. What are the third party tools you are used? 26. What are the system variables you have used?
Q.1:What protection will be used on HT and LT side of 33/0.4 KV, MVA transformer. Indicate capacities of protective device to be used. Q.2:Which types of back-up protections are used in the power transformers? What do you understand by the term over travel in the relay? Q.3:How star and delta connected winding transformer are provided from earth fault
DRAW ACIRCUIT DIAGRAM OF 100 KVA 415V/55-0-55V DELTA TO STAR TRANSFORMER
Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A
How much minimum insulation required between 11kv/3.3kv transformer windings?
why and how voltage sharing in transformer, during magnetic balance test ?
how you will decide the distance between the power transformer and its fencing
what is earth fault relay 64T, why it is used in main Incomer and neutral CT of Transformer.
How to add default rules in transformer?