WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING
Answer / abhishek
Zero Value in Quantity Survying means
Difference Between Tender Cost (BOQ Cost) and Actual Cost
(After Execution)..
| Is This Answer Correct ? | 11 Yes | 1 No |
how to cement bag calculate m25 grade
for gravel roads in India to get 1feet height how much height we have to fill
why & what is perchatage we are using fly ash in concrete?
Why bent up bars provided in R.C.C slab
16 Answers GATE, L&T, Omax,
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
What is the IS code of Rcc & PCC
what or who influenced you in making your choice?
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
Are you good at detailing and explain about the project you have worked on detailing?
Civil engineering
What is the likely strength of a 1:2:4 concrete mix?
Why we do soil classification?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)