WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING
Answer / abhishek
Zero Value in Quantity Survying means
Difference Between Tender Cost (BOQ Cost) and Actual Cost
(After Execution)..
| Is This Answer Correct ? | 11 Yes | 1 No |
What is the distance between railway tracks?
What is the per cu. mt. price of ready mix in Gujarat region.?
In T beam design, which are the regions selected as rectangular and Flanged ?
What is the name of this multiplication factors ?
0 Answers Engineers India Limited, L&T,
what is difference between long column and short column?
16 Answers L&T, Tomi Polytechnic,
Pl. enlighten whether M20 grade RMC is suitable for columns & beams for 5 storied residential building
which type of crust is best suitable to develop flexible pavement in rural roads i.e either with wet mix macadam or Water Bound Macadam and its reasons.
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What is a Quick Sand?
Explain different types of rcc pipes.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)