Answer Posted / abhishek
Zero Value in Quantity Survying means
Difference Between Tender Cost (BOQ Cost) and Actual Cost
(After Execution)..
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
what is c4x light weight cement blocks
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Name the main components of a cad gui?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
How many bricks are there in 100cft?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
what is the coefficient for running feet to cft coversion both area and price
what is Brest Wall?
How to find out kg per Sft ?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
WHAT IS YOUR CURRENT SALARY
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?