Answer Posted / jemiah
Absolutely. If the job calls for it and the overtime pay is good, why not>
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is structural frames or systems?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Slump Values for works?
Civil engineering related
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
where can i get the previous question papers for rrb section enginerr (civil)
For what purpose bedding is used under storm water drains?
What is semirigid connections?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?