Answer Posted / jemiah
Absolutely. If the job calls for it and the overtime pay is good, why not>
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
Define absolute co-ordinates?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
why the openings of sieves are square io size?
why the profile of shell of natural draught cooling tower is hyperabolic.
How do you compute volume of airflow?
why does the most of civil engg is not intersted to going for teaching field?
What is Rankine Cycle?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
cement and sand required for one block of size 0.23*0.15*0.46
What is the largest concrete dam in the world?
how to calculate the concrete mix m30 by volume