Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A 3 phase motor operating off 415V system is developing 20Kw
at an efficiency of 0.77 and power factor of 0.73.
determine:-

a)the line current.
b)the phase current if winding are delta connected.
c)the phase voltage if winding are star connected.



A 3 phase motor operating off 415V system is developing 20Kw at an efficiency of 0.77 and power fac..

Answer / v.srinivas

I=P/1.732 X 415 X EFF X PF=49.5(LINE CURRENT)
28.57 AMPS (PHASE CURRENT)
Phase voltage in star connection; 718.78

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the abbreviation for F.M In FM-200 fire suppression system

1 Answers  


What is the Difference Between MCCB & ACB & VCB

58 Answers   Absotherm, Delton, Divine, JLL, Jyoti Ltd, Kirloskar, L&T, RPP, Siemens, TCL, TCS, Teekays, YSJ,


what is the function AND aplication of CBCT?

2 Answers  


What is the difference between grid and off- grid system??

0 Answers   GVK,


why we are using DC violtage for testing of cables....which is used in HV AC applicatons...

1 Answers  


WHAT IS THE FAULT WHEN 100HP TURBINE MOTOR TRIPS, LIST THE FAULTS AND ITS TRABULESHOOTING TIPS.. MY AUTO TARNSFORMER STARTER TRIPS

0 Answers   MPS Techologies,


area control error

0 Answers  


What are the conditions to be satisfied before connecting two DC generators in parallel?

9 Answers   Bhel, Godrej,


What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

0 Answers  


what is active network?

2 Answers  


why we use delta connection in transformer

2 Answers   UPPCL,


HOW DO YOU CAN CHECK A 15KV DIODE, WHETHER IT IS OK OR NOT?

0 Answers   TMB,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)