How to identify the start and end of 3phase 12 lead motor
if U1, U2, etc numberings are lost or erased.
No Answer is Posted For this Question
Be the First to Post Answer
why insulation cost is more in underground cable than in overhead line?
1 no. 22 kV feeder is taken from state electricity board. 350 MVA is the S.C. MVA. now i am feeding this feeder to HT Panel having 2 outgoings which further supply to 2 Transformers. Can you please suggest me the type & rating of cables are 3 of these cables same? or they are different? please help...............
What is meant by bus bar protection?
what is the main difference b/w contactor and relay
2 Answers Pace Pharmaceuticals,
WHAT IS THE REASON FOR LOW VOLTAGE IN HOUSES?*
a distribution transformer(3 phase)supplying 440volt per phase.now suppose one of phase voltage(230volt) becomes zero.what will be the cause ?
please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com
how choose conductor&depending upon load
How can we calculate C10 rating of a bttery from c5 or c20 ratings??
anyone knows service engineer in chennai for EDM SPARKING MACHINE.CHMER PULSE CD 60 M.pL GIVE ANY CONTACT NOS
i have a 1500kVA transformer what is the kWH meter i need to use?
0 Answers HP, L&T, Mohammed Harasani Architects,
what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)