Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1.Difference between vcb and Acb and partes.
2.Difference between STS and ATS.

Answers were Sorted based on User's Feedback



1.Difference between vcb and Acb and partes. 2.Difference between STS and ATS...

Answer / thowsif_emerson

1.VCB= vacuum circuit breaker normally used in HV
applications.
ACB = Air circuit breaker, normally used in LV
applications.

2.There are two main technologies used for these devices
with different characteristics in terms of
switching quality and cost each having its merits and
deficiencies: Static Transfer Switches
(STS) and Automatic Transfer Switches (ATS).

A>STS is based on static electronic components (SCR)
therefore allowing for a fast and precise
control of the switching between one line and the other.
This solution permits to obtain a perfect
Break Before Make (BBM) behaviour by never permitting a
source overlap. Moreover, it is also
capable of very fast switching between the two sources with
a max delay of less than 5 msec
(typically 4 msec).

B>ATS is based on electromechanical components where the
BBM switching is actually made by
controlling the relays on each source line. This kind of
technology can still make a perfect Break
Before Make change of supply sources both in synchronous
and asynchronous conditions but it
is certainly slower than the static solution.

Is This Answer Correct ?    10 Yes 0 No

1.Difference between vcb and Acb and partes. 2.Difference between STS and ATS...

Answer / dips

VCB means vacuum CB
ACB means air CB

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

What is the significance of integral controller and derivative controller in a pid controller?

0 Answers  


What kind of test is conducted commonly for generator? And explain briefly

1 Answers   MAHINDRA,


What are all the conditions to protect generator & turbine in thermal power plant?

1 Answers   Power Grid,


whycircuit breaker is not connected at the generator end where the capacity of the generator is more say 60MW, 100MW etc.

2 Answers   Adani, Adani Power,


For maintenance Department What type documention requir for ISo & TS audit

1 Answers   Megatron Solutions, Sams,


what is the principle of operation of synchronous motor and generator? explain in detail.

2 Answers   Maruti Suzuki,


how to reduce the initial starting amps which is equal to the running load amps

3 Answers  


Why the power factor of the alternator in power plant is kept .8 lagging. Can't we maintain it at 1.

3 Answers  


Which transformer is suitable for 220/11 kV, 60 MVA, distribution , Y-Y or D-Y or Y-D, give comparison for the same.

3 Answers  


why we r used DC megger insted of AC megger?

1 Answers   Adani,


Discuss the effect of sudden loading of an induction motor

0 Answers  


what is the method to measure the transformer current carrieng capacity in three phase.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)