What is the dimension of Slump cone which is used to measure
the Slump value of concrete? Slump value for Pile concrete?
Slab concrete? Column concrete?

Answers were Sorted based on User's Feedback



What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump va..

Answer / nikunj faldu

cone bottom dia 200mm
cone top dai 100mm
cone hight 300mm
measure the slump value is 25mm to 175mm
slump value for pile above 150mm (beacuse in the pile we
can't compection.)atherwise as per desing also.

Is This Answer Correct ?    35 Yes 4 No

What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump va..

Answer / raju gohel

one bottom dia 200mm
cone top dai 100mm
cone hight 300mm

slump value is depending upon reinforcement & water cement ratio

Is This Answer Correct ?    17 Yes 3 No

What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump va..

Answer / harish

cone bottom dia 200mm
cone top dai 100mm
cone hight 300mm
measure the slump value is 25mm to 175mm
slump value for pile more than 100-150mm atherwise as per
desing also.

Is This Answer Correct ?    6 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

what is the density of fine sand grade-2

3 Answers  


what is work of planning deptt. in any construction compny (in road project)

0 Answers   bscpl,


what is the difference between TOR & TMT

1 Answers   Wonderla Holidays,


How do You Maintain a structure after getting cube test of low strength.

0 Answers   L&T, Meinhardt,


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

0 Answers  






How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

0 Answers   BVG,


WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING

1 Answers  


how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4

3 Answers   L&T,


16. What do you consider to be your greatest achievement so far and why?

2 Answers  


y we need to take 28 days strength as compressive strength ? y cant we take 30 th day

2 Answers  


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

0 Answers  


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16636)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)